EasyManua.ls Logo

Human Humalyzer 2000 - Vacuum Pump and Pump Control PCB; Temperature Control

Human Humalyzer 2000
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
Rev.
B
Vacuum
Pump
and
Pump
Control
PCB
The
vacuum
pump
and
pump
control
PCB
should
require
no
maintenance.
If
the
vacuum
pump
runs
continuously,
you
probably
have
a
leak
in
the
vacuum
side.
Check
the
waste
bottle
cap
and
fittings.
Check
that the
tubing
is
firmly seated
on
barbs
and
all
fittings
are
tight.
Turn
the
fittings
only
until
finger-tight.
Do
not
over-tighten
the
plastic
Luer
fittings!
If
the
waste
bottle
is
located
at
a
higher
or
lower
level
than
the
instrument,
such
as
on
a
shelf,
or
if
the
instrument
is
used
at
very
high
altitudes,
the
vacuum
trimpot
may
require
adjustment.
See
the
section
“Vacuum
Adjustment”.
If
the
vacuum
pump
is
taking
longer
to
achieve
full
vacuum
(runs
much
longer
than
usual,
but
otherwise
works),
the
exhaust
filter
is
likely
clogged
and
should
be
replaced.
In
the
event
that
the
exhaust
filter
gets
wet
due
to
a
waste
bottle
spill,
it
must
be
replaced.
See
the
section
"Exhaust
Filter
Replacement".
"Temperature
Control
The
temperature
control
system
is
very
stable
and
ordinarily
does
not
require
adjustment
or
recalibration.
In
the
event
calibration
must
be
verified
or
re-established,
refer
to
the
section
“Temperature
Calibration”.
Humalyzer
2000
Service
Manual