EasyManua.ls Logo

Hunter 50 - DC Electric System Operations

Hunter 50
196 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Hu
nt
e
r
50
• D
C
Electric
7.
8
7.3 O
p
erations and Maintenanc
e
7.3.1 To operate the 12 Volt DC S
y
stem
:
1. Switch the main batter
y
switch in the main salon bunk
2.
S
witch the D
C
main circuit breaker at batter
y
switch
panel to
O
N
.
3
.
S
witch on relevant breakers at the MDP
.
Note: Always switch circuit breakers off when you leave your
boat unattended.
7.3.2 To manuall
y
operate
y
our bil
g
e pumps
:
Note: The power to the MDP does not need to be energized in
order to manually operate your bilge pumps, however for auto-
matic operation power does need to be supplied to the MDP.
1. Locate the bil
g
e pump switches at the Nav station and
switch them to the manual position
.
2. Another
p
rocedure to be used in extreme circumstanc-
e
s involves locatin
g
the
f
loat switch and manuall
y
rotatin
g
th
e
f
l
oa
t h
a
n
d
l
e
o
n th
e
s
i
de
of
th
e
f
l
oa
t
s
wit
c
h t
o
s
im
u
l
a
t
e
the float switch bein
g
underwater. This will ener
g
ize the
pump and the pump will operate.
7.3.3 To o
p
erate the macerator
p
um
p:
CAUTION
! !
D
o not place facial tissue, paper towels, or sanitar
y
napkins in head. Such materials can dama
g
e waste
di
sposa
l
s
y
stems an
d
t
h
e env
i
ronment
.
Important: U.S.Coast Guard regulations require that boats
have a sanitation system on board to control pollution. Waste
is to be stored in a holding tank or other device so it can be
properly disposed of at a shore facility. Discharging this waste
overboard in the U.S. lakes, rivers, bays, and sounds and with-
in 3 miles of shore in international waters is prohibited. Check
with the Coast Guard regarding regulations in your area.
1. Power u
p
the DC
p
anel as described in this section.
2.
O
pen the seacock valve located under the steps to
salo
n
.
3
.
S
witch the MA
C
ERAT
O
R breaker at the D
C
main elec-
trical control
p
anel to
O
N
.
4. Turn the macerator switch to the “on” position at the
Nav Station. This is a momentar
y
switch,
y
ou must hold
the switch to operate.
5
.
All
ow t
h
e macerator to run unt
il
t
h
e
h
o
ldi
n
g
tan
k
i
s
e
mpt
y
, but no lon
g
er. Runnin
g
the macerator when the
tank is empt
y
will dama
g
e the pump. When
f
ull, the
macerator w
ill
h
ave a
l
ow p
i
tc
h
g
r
i
n
d
.
Wh
en empt
y
, t
hi
s
c
han
g
es to a hi
g
h pitch
g
rind.
6
. When
y
ou hear the pump speed up
(
indicates tank is
e
mpt
y)
, immediatel
y
switch the MA
C
ERAT
O
R breaker to
O
FF.
7.
C
lose the seacock.
WARNING
! !
If the seacock is not closed, the holdin
g
tank will fill
with sea water and could possibl
y
flood the boat.
7.3.4 To operate the en
g
ine compartment blower:
P
ower up the DC s
y
stem as discussed in this section.
T
u
rn
o
n th
e
r
oc
k
e
r
s
wit
c
h l
oca
t
ed
in th
e
af
t
cab
in
.
7.3.5 To o
p
erate the windlass
:
1. Power up the windlass
f
rom the batter
y
switch.
2. Th
e
co
ntr
o
l
s
fo
r th
e
win
d
l
ass
a
r
e
o
n th
e
dec
k t
o
th
e
ri
g
ht o
f
the anchor well.
For more in
f
ormation about
y
our windlass, re
f
er to the
U
nderwa
y
S
ection o
f
this manual.
7.3.6 CO Monitors
For
y
our protection, we have installed C
O
monitors
aboard
y
our boat. Be sure and check
y
our
O
wner’s
P
acket
f
or more in
f
o concernin
g
y
our
CO
detectors. You
c
an also review that dan
g
ers of C
O
in the Boatin
g
Safet
y
C
hapter o
f
this manual.
D
o not spra
y
waxes or c
l
ean
i
n
g
a
g
ents on t
h
e mon
i
tor.
7.3.7 Maintenanc
e
The maintenance o
f
y
our D
C
s
y
stem is ensurin
g
that all
c
onnections are clean, ti
g
ht, and covered with a corrosion
i
n
hibi
tor compoun
d
.

Table of Contents

Related product manuals