Operation Instructions for TCX50H Tire Charger
29
AIR-JET
FROM HERE
To increase the effectiveness of the ination jets, always liberally lubricate beads
and raise the lower bead while activating ination jets.
NOTICE
Step down partially on the pedal to inate tire and seal beads with ination hose. Frequently
stop to check bead seating pressure on gauge.
Do not exceed tire manufacturer’s maximum pressure as stated on the sidewall of
the tire when seating beads.
WARNING
Reinstall valve stem core into the valve stem after beads have been seated, and then inate
tire to vehicle manufacturer recommended pressure.
WARNING
Activate air ination jets only when sealing bead.
Bleed air pressure from system before disconnecting supply line or other pneumatic
components. Air is stored in a reservoir for operation of ination jets.
Only activate the air ination jets if the rim securing device is locked in place and
the tire is properly clamped.
WARNING
Never mount a tire to a rim that is not the same diameter (e.g., 16 1/2 inch tire
mounting on a 16 inch rim).
WARNING
WARNING
Never inate using “shop air” on the tire changer.
Use a safety cage in accordance with tire manufactures recommendations if ination
pressures beyond the tire changer equipped regulated air is required.
If tire is over-inated, air may be removed from the tire by pressing the brass manual air
release button located below the air pressure gauge.
Disconnect ination hose from valve stem.