EasyManua.ls Logo

Hussmann Q3 - Installation Procedures

Hussmann Q3
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Installation
NOTICE
Do NOT remove Foam Blocks from shelves
and glass until the merchandisers are
positioned for installation. Shelves or
merchandising glass may be damaged.
Wrapped Top
and Shelves
Foam Blocks
in place
Warning
Labels
Loose
Items
Case is to arrive at store as was shipped form
factory. See reference above for proper shipment
referencing.
Receiving Case
Upon receiving your new Hussmann Case all
equipment should be thoroughly examined for
shipping damage before and during unloading.
This equipment has been carefully inspected at
our factory. Any claim for loss or damage must
be made to the carrier. The carrier will provide
any necessary inspection reports/ or claim form.
If there is obvious loss or damage, it must be
noted on the freight bill or express receipt and
signed by the carrier’s agent; otherwise carrier
may refuse claim.
Snapping Chalk Lines
Preparepermanentpositioningbymarkingoors
with Chalk snap lines where cases are to be
located. Chalk lines are to run along the base or
legs of cases.

Related product manuals