EasyManua.ls Logo

Hypertherm powermax 380 - Routine Maintenance Schedule

Hypertherm powermax 380
51 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-2 powermax380 Operator Manual
0
MAINTENANCE AND PARTS
Routine Maintenance
WARNING
ELECTRIC SHOCK CAN KILL
Disconnect electrical power before performing any maintenance.
All work requiring removal of the power supply cover must be
performed by a qualified technician.
Each Use
0
140140
5050
100100
PAC110T
Check gas pressure.
Replace damaged power
cord or plug.
Replace damaged
torch lead.
Check pressure hose and
connections for leaks.
Clean the inside of the
power supply with air
pressure or vacuum.
Replace damaged labels.
Check torch cap-on safety switch: listen for
"click" when the retaining cap is loosened.
Check consumables for wear
and proper installation.
Check trigger for damage. Check torch body
for cracks or exposed wires.
Each Week
6 Months
3 Months
PAC110T

Table of Contents

Related product manuals