Power Supply Priority Description
1. PV (solar) PV Power is prioritized to charge the battery.
2. Battery
The battery power will kick-in when the PV power is
insucient.
3. Utility (AC Input)
The utility pass-through powers the loads when both
the PV power and the battery power are insucient.
The utility power will not charge the battery.
Energy Saver Mode Settings
Note: The Energy Saver mode is not available for a multi-unit parallel system.
Table 6.3 Power supply priority - Bat first modes
Fig. 6.17 • Energy saver mode settings
Working Mode UPS AC F.C. Bat First
Unattended 90% ON OFF
Language English España
Display Settings
Date/Time Brightness
Sound
WiFi
Reset
ON OFFEnergy Saver
Parallel Mode Single P. Split P. 3 Phase
Home
Settings
Information
Alerts
中文
The following table (Table 6.3) shows the power supply priority when the unit
is in Bat First mode.
Working Mode UPS AC F.C. Bat First
Unattended 90% ON OFF
Language
中文
English España
Display Settings
Date/Time Brightness
Sound
WiFi
Reset
ON OFFEnergy Saver
Parallel Mode Single P. Split P. 3 Phase
Settings
Back
Next
3
Fig. 6.16 Select bat first button
3. From the Settings menu, select the
Bat First button (Fig. 6.16).