Figure 35. Replacing right ear cap
5. Push the enclosure into the rack while pulling the outer rail until the outer and the inner rails lock into
the serviceable position. This is accompanied by an audible click.
6. Press the release tab and push the enclosure fully into the rack.
Release Tab
Figure 36. Release tab
7. Secure the enclosure on the left and right front of the enclosure to the left and right front rack posts by
using the two M5 X 9 shipping screws as shown in the following gure.
Figure 37. Securing the enclosure
At this point, the rails and IBM Elastic Storage System 3200 enclosure are installed. The enclosure is
mounted on the rail with all the components that were removed, reinserted into the slots.
Chapter 4. Installing
55

Table of Contents

Other manuals for IBM Elastic Storage System 3200

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the IBM Elastic Storage System 3200 and is the answer not in the manual?

IBM Elastic Storage System 3200 Specifications

General IconGeneral
BrandIBM
ModelElastic Storage System 3200
CategoryStorage
LanguageEnglish

Related product manuals