TM 10-7360-226-13&P 
 
 
CONTAINERIZED KITCHEN (CK)  0016 00 
PREVENTIVE MAINTENANCE CHECKS AND SERVICES 
 
0016 00-9/10 Blank 
 
THIS SECTION COVERS: 
After Operation Preventive Maintenance Checks and Services (PMCS) 
 
INITIAL SETUP: 
Kitchen Set Up/Not Operating 
Maintenance Level: 
Operator/Crew 
Table 3.  After Operation PMCS for CK 
ITEM 
NO. 
INTERVAL MAN-
HOUR 
ITEM TO BE 
CHECKED OR 
SERVICED 
PROCEDURE EQUIPMENT 
NOT READY/ 
AVAILABLE IF: 
1 
 
After    Container  Inspect shelter fabric, floor covering 
and screens for holes, tears, or loose 
seams.  Inspect hook and loop 
closures for damage and proper 
operation. 
 
        Inspect doors for damage to hinges, 
handles, or seals. 
 
        Inspect stair/ladders and railings for 
damage, cracked welds. 
Damage, cracked 
weld. 
2  After    Cook center  Inspect filters for grease accumulation.  
Remove and clean as necessary. 
 
3  After    ECU filters  Inspect filters for damage, cleanliness.  
Remove and clean as necessary. 
 
4 After   Dual oven 
assembly 
Inspect ovens for cleanliness.  Clean 
as necessary. 
 
5 After   Tray pack 
heater 
Inspect interior of heater for 
cleanliness.  Clean as necessary. 
 
6 After   Hand sink 
assembly 
Inspect cabinet, sink, faucet for 
damage, evidence of leakage. 
Any leak.  Pump 
or water heater 
inoperable. 
7  After    Refrigerators  Inspect door seal for proper contact.  Door not properly 
sealing.   
 
END OF WORK PACKAGE