Single Stage Multi Position Furnace
Service
Manual
43
440 08 2001 02
Connect the
3
/
4
² OD rubber hose with the 90° bend to the drain stub
on the bottom of the plastic transition box and secure with a
3
/
4
²
clamp.
Route the hose to the large drain stub on the condensate trap. Cut
off excess hose and discard. Connect the hose to the drain stub on
the transition and secure with a
3
/
4
² clamp.
Connect the
5
/
8
² OD rubber hose with the 90° bend to the left drain
stub on the vent fitting and secure with a
5
/
8
² clamp.
Route the hose to the smaller stub on the condensate trap. Cut off
excess hose and discard. Connect the hose to the drain stub on the
trap and secure with a
5
/
8
² clamp.
For left side or right side mounted condensate trap, the pres-
sure tap on the condensate trap MUST be connected to the unused
pressure tap located on the top of the plastic transition box. Remove
the plastic caps from the pressure tap on the condensate trap and
the plastic transition and connect the
5
/
16
² OD rubber hose. (See
Figure 50)
NOTE: Ensure hoses maintain a downward slope to the conden-
sate trap with no kinking or binding for proper condensate drainage.