Wet Down Wash
Introduction
The Wet Down process is the first thing the opening person should do to
prepare the wash for the first customer. When selected the process is setup
to activate all relays (outputs) which have been designated to turn on
during the Wet Down cycle. The cycle time is setup in the Wash Settings
menu. By “wetting down” the cloth equipment and perhaps charging the
foaming manifolds in the wash the wash will be better “tuned” to process
the first vehicle and therefore provide a more consistent wash to the
customer.
Procedures
Follow these procedures to Wet Down the wash.
Step Action Screen Displays
1 Access the Main Menu by
pressing the “Menu” button
on the display pad.
Note: If a password has been
set it will be necessary to
enter the password before
the main menu can be
accessed.
[1] Shift Break [4] View Counts
[2] Wet Down Wash [5] Print Reports
[3] Configure Wash
2 Press the numeric key “2” to
select Wet Down Wash.
Note: The relays will be
activated and you will be
returned to the main display
screen. A second to second
countdown will start next to
the word “WETDOWN.”
This system will continue
counting down until it
reaches 0 and then shut all of
the activated relays off.
ICS OEM Tunnel Controller 10:25:35 PM
VER 1 REV 5.11 04/15/2002
WETDOWN 085 SECS CARS 0000

Other manuals for ICS Tunnel Master Jr

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ICS Tunnel Master Jr and is the answer not in the manual?

ICS Tunnel Master Jr Specifications

General IconGeneral
BrandICS
ModelTunnel Master Jr
CategoryController
LanguageEnglish