vogue system boiler -
Installation and Servicing
general
51 37.5 132132 50 42.5
445
450
330
2.5
2.5
from case
740
Side flue
dim. A
Cond. Drain
CH Flow
CH Return
PRV Outlet
Gas Inlet
1
BOILER DIMENSIONS, SERVICES & CLEARANCES
all dimensions in mm
The boiler connections are made on the boiler connection tails.
Refer to Frame 28.
The following minimum clearances must be maintained for
operation and servicing.
Additional space will be required for installation, depending
upon site conditions.
Side and Rear Flue
a. Provided that the ue hole is cut accurately, e.g. with a core
drill, the ue can be installed from inside the building where
wall thicknesses do not exceed 600mm (24”). Where the
Front clearance
The minimum front clearance when built in to a cupboard is 5mm
from the cupboard door but 450mm overall clearance is still
required, with the cupboard door open, to allow for servicing.
* Bottom clearance
Bottom clearance after installation can be reduced to 5mm.
This must be obtained with an easily removable panel, to enable
the consumer to access the lling loop, and to provide the 100mm
clearance required for servicing.
space into which the boiler is going to be installed is less
than the length of ue required the ue must be tted from
the outside.
Installation from inside ONLY
b. If a core boring tool is to be used inside the building the
space in which the boiler is to be installed must be at least
wide enough to accommodate the tool.