8
• Installation should definitely fill and drain valve.
• Safety valves must be in the water outlet.
• Boiler lit (off) the water pressure should be in the range of 1-1,5 bar. Otherwise
drain / refill valve should be checked.
• Our company is not responsible for any problems that may arise from the use
of chimneys that are not in compliance with chimney pipe standards.
• The distance between the chimney and roof must be 80 cm at least.
• The product is out of warranty if an anticondenser valve is not used.
• Fuel loading must be performed from the test menu to the fuel tank from the
helix to the pot at the first start.
İFYIL Boiler must not be installed into open, moistured, idle places etc. boiler
must not have direct contact with outdoor ambient.
Customers not obeying the above requirements and schemas cannot claim
any right for any problem.