3.23 BOILER REGISTRATION.
is Commissioning Checklist is to be com-
pleted in full by the competent person who
commissioned the boiler as a means of dem-
onstrating compliance with the appropriate
Building Regulations.
Failure to install and commission according to
the manufacturer’s instructions and complete
this Commissioning Checklist may invalidate
the warranty.
Customer name: Telephone number:
Address:
Boiler make and model:
Boiler serial number:
Commissioned by (PRINT NAME): Plumbing license number:
Company name: Telephone number:
Company address:
Commissioning date: Commissioning date:
Certicate of compliance number:
CONTROLS (tick the appropriate boxes)
Time and temperature control to heating
Room thermostat and programmer/timer Programmable room thermostat
Weather compensation Optimum start control
Time and temperature control to hot water Cylinder thermostat and programmer/timer Combination boiler
Heating zone valves Fitted Not required
Hot water zone valves Fitted Not required
ermostatic radiator Fitted Not required
Automatic bypass to system Fitted Not required
Boiler interlock Provided
ALL SYSTEMS
e system has been adequately ushed and cleaned? Yes
What system cleaner was used?
What inhibitor was used? Quantity Litres
Has a system lter been installed? Yes No
HEATING MODE measure and record:
Burner inlet gas working pressure (at maximum rate) Kpa OR gas inlet pressure Kpa
Central heating ow temperature °C
Central heating return temperature °C
COMBINATION BOILER DOMESTIC HOT WATER MODE measure and record:
Burner inlet gas working pressure (at maximum rate) Kpa OR gas inlet pressure at maximum rate Kpa
Cold water inlet temperature °C
Hot water has been checked at all outlets Yes Temperature °C
Has a DHW tempering valve been tted to sanitary ttings? Yes Temperature °C
Water ow rate I/min
CONDENSING BOILERS ONLY
e condensate drain has been installed in accordance local laws in force? Yes
ALL INSTALLATIONS
Record the following:
At max. Rate: Co Ppm Co
²
% Ratio CO/CO Ratio
At min. Rate: (where possible) Co Ppm Co
²
% Ratio CO/CO Ratio
e heating and hot water system complies with the appropriate Building Regulations Yes
e boiler and associated products have been installed and commissioned in accordance with the manufacturer’s instructions Yes
e operation of the boiler and system controls have been demonstrated to and understood by the customer Yes
e manufacturer’s literature, including Commissioning Checklist and Service Record, has been explained and le with the customer Yes
Commissioning Engineer’s Signature
Customer’s Signature
(To conrm satisfactory demonstration and receipt of manufacturer’s literature)