4. System Setup
The following steps will guide you through the required
connection for powering up the unit:
1. Plug the power cord in the appropriately rated outlet
(120VAC/15A).
2. Mount the load cell onto the threaded rod with the I-
bolt (as shown in Figure 1).
3. Attach the loading rod to the load cell.
4. Mount the LVDT holder onto one of the reaction frame
posts (as shown in Figure 1).
5. Plug either the 10 kN or (optional) 50 kN Load Cell into
Channel 1, LVDT into Channel 2.
6. Ensure that the nuts on either side of the reaction bar
are tightened by hand.
7. Power ON the Auto_SCB
TM
using the switch located on
the right side of the device next to the power cord.
8. The unit will perform a self-test and will show when
ready.
9. If an alarm ( ) is shown, please refer to the Alarms
section.