DOSE IT – Operating instructions V08 Installation
www.integra-biosciences.com 9
3 Installation
The DOSE IT is a ready-to-use peristaltic pump that requires only a minimal installation
procedure. It shall be installed on a planar surface, in a dry and dust-free environment.
N
OTE
Before proceeding with the installation compare the contents of the package
with the list “2.1
Scope of delivery” on page 7. Should something be missing
or should you find a faulty component, please contact your local INTEGRA
Biosciences representative.
3.1 Power supply connection
Connect the AC adapter cable to the DOSE IT mains connection socket and plug it to the
electricity mains.
W
ARNING
The supply voltage must meet the requirements of the AC adapter:
100 - 240 VAC, 50 - 60 Hz.
3.2 Retort rod and filling arm (optional)
Fix the retort rod with the two screws on the rear side, using
a Phillips screwdriver (PH2), see "
Screw threads for fixation
of the retort rod" on page 8.
Mount the filling arm onto the rod and tighten it with the side
lever in order to prevent it from moving during dispensing.