IONTECH
®
IT-DS EDI Modules
DURING SHIPMENT, THE PRESSURE FROM THE INCOMING
WATER CAN CAUSE PERMANENT DAMAGE. SEE SECTION 3.2
BOLT TORQUE MUST BE CHECKED AND THE MODULE TIGHTENED AS
REQUIRED BEFORE FLOWING WATER INTO THE MODULE.
REFERRING TO FIGURE 3-1 AND TABLE 3-1, TIGHTEN AS
REQUIRED. NOT ALL MODULES WILL NEED TIGHTENING.
OPERATIONAL LOG SHEETS ARE NECESSARY TO ENSURE
CONSISTENT OPERATION, DETERMINE CLEANING REGIMENS,
TROUBLESHOOTING AND AS A REQUIREMENT FOR MODULE
DO NOT OPEN THE IT-DS MODULE. OPENING THE MODULE WILL VOID
THE WARRANTY AND DO IRREVERSIBLE DAMAGE
THE MODULE MUST BE OPERATED INSIDE ITS DESIGN
SPECIFICATIONS FOR TEMPERATURE AND HUMIDITY. SEE
IMPORTANT - PIPE SECTIONS PREPARED FOR INSTALLATION
MUST BE INSPECTED, AND BE FREE OF DEBRIS FROM STORAGE
OR CUTTING TOOL PARTICLES. THE FEED WATER SYSTEM
SHOULD BE THOROUGHLY RINSED TO ENSURE THAT
PARTICULATES AND CONSTRUCTION DEBRIS ARE REMOVED
FROM THE FEED WATER SYSTEM
IT-DS MODULES HAVE NARROW FLOW DISTRIBUTION
CHANNELS THAT CAN BECOME PLUGGED BY PARTICLES
CAUSING PERMANENT DAMAGE. ALWAYS INSTALL
PRESSURE GAUGES, SAMPLING PORTS, SENSORS, ETC.
IN TEE FITTINGS. DO NOT DRILL OR TAP INTO PIPING.
AFTER INSTALLING GAUGES, SAMPLING PORTS,
SENSORS, ETC., ALWAYS FLUSH OUT THE PIPING BEFORE
CONNECTING TO THE IT-DS MODULE TO REMOVE ANY
DURING OPERATION, THE ELECTRODE WIRING INSIDE THE
MODULE JUNCTION BOXES ARE AT HIGH VOLTAGE AND PRESENT A
BEFORE TOUCHING THE INSIDE OF THE JUNCTION BOX,
CONFIRM THAT AC POWER HAS FIRST BEEN DISCONNECTED
AND LOCKED OUT ACCORDING TO STANDARD LOCKOUT/TAGOUT
TO ELIMINATE THE POSSIBILITY OF ELECTRIC SHOCK, CONFIRM
THAT ALL GROUND WIRES ARE PROPERLY CONNECTED.
THOROUGHLY READ ALL THE INFORMATION IN THIS MANUAL
BEFORE OPERATING THE IT-DS MODULE.
Keep the top of the unit clear of tools, nuts, screws, etc. to prevent these items from