EasyManua.ls Logo

Jerr-Dan MPL-40 - Tow Sling Operation (Optional)

Default Icon
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 4 : Operation
4-36 5376000277
4.11 TOW SLING OPERATION (OPTIONAL)
If your MPL40 is equipped with a towing sling, consult the AAA Towing
Manual for hook up and follow these steps:
1. Position the truck within 9 ft. of
the subject vehicle and as close
to the direction of the tow as
possible.
2. Unfold the underlift.
3. Remove the tow sling hold back
bar retaining pins allowing the
hold back bars to swing out of
its retaining brackets on the
sides of the boom.
9 FT

Table of Contents

Related product manuals