EasyManua.ls Logo

Jerr-Dan MPL-40 - Page 80

Default Icon
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 4 : Operation
4-42 5376000277
27. Swing the hold back bars in
toward the tow sling storage
brackets on the side of the
boom. Allow the hold back bars
to retract as necessary.
28. Connect the hold back bars to
the tow sling storage brackets
using the pins that you removed
earlier.
29. Rotate the “CAM” handles on
the hold back bars 180° to the
closed position.
30. Retract the wrecker boom, snug
up the wire rope(s) and fold up
the underlift.

Table of Contents

Related product manuals