Section 4 - Operation
4-131200345
SECTION 4 - OPERATION
4.1 PREPARING MACHINE FOR PLATFORM OPERATION
The following must be completed from the cab to transfer power to the platform.
1. Verify platform is properly installed and quick attach lock pin is fully engaged. See
“Platform Installation” on page 5-3. Platform (1) will be shown on display.
2. Apply park brake.
3. Shift transmission control lever to neutral.
4. Fully retract boom and lower boom below 10 degrees.
5. Fully lower outriggers, lifting front tires and ensure machine is level. Display indicates
when outrigger (2) and level (3) requirements are satisfied.
6. Shut off engine and rotate key to Platform position. Display indicates machine is in
platform mode (4).
7. Remove key and verify the power/emergency stop switch is pulled up.
8. Exit cab.