EasyManua.ls Logo

JLG E400A Narrow - Preparation and Inspection; Operation

JLG E400A Narrow
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 6 - ACCESSORIES
3121716 6-3
Preparation and Inspection
Ensure racks are secured to the platform rails.
Replace torn or frayed tie-down straps.
Operation
1. To prepare racks for loading, remove locking pins, rotate
each rack 90 degrees from stowed to working position, then
secure with locking pins.
2. Loosen and remove tie-down straps. Place material on racks
with weight evenly distributed between both racks.
3. Route the tie-down straps at each end across loaded mate-
rial and tighten.
4. To remove material, loosen and remove tie-down straps,
then carefully remove material from racks.
NOTE: Reinstall tie-down straps across any remaining material before
continuing machine operations.
To order go to Discount-Equipment.com

Table of Contents

Related product manuals