EasyManua.ls Logo

JLG E400A Narrow - Page 128

JLG E400A Narrow
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SECTION 7 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
3121716 7-21
2. Tighten nuts in the following sequence: 3. The tightening of the nuts should be done in stages. Follow-
ing the recommended sequence, tighten nuts per wheel
torque chart.
4. Wheel nuts should be torqued after first 50 hours of operation
and after each wheel removal. Check torque every 3 months or
150 hours of operation.
Table 7-12. Wheel Torque Chart
TORQUE SEQUENCE
1st Stage 2nd Stage 3rd Stage
40 ft. lbs.
(55 Nm)
100 ft. lbs.
(130 Nm)
170 ft. lbs.
(255 Nm)
To order go to Discount-Equipment.com

Table of Contents

Related product manuals