EasyManua.ls Logo

JLL S400 - Assembly; Site Preparation and Parts

JLL S400
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Assembly
7
www.jlltness.co.uk www.jllelectronics.co.uk
Console
Safety key
Fast / Slow speed button
Heart sensor
Handrail
Motor cover
Running Belt
Side frames/rails
Rear adjuster
Pad adjuster
Up-down leg
Vertical frame
Diagram
Item
holder
Transport wheels
Preparing Site
Before assembling, verify the choosing site meets
the following criteria:
Area is well illuminate and well ventilated
Surfaced is levelled.
Free area for access to unit and emergency
dismount. If it is possible keep the following
clearances: 0.5 m at each side and 2.0 m at
the back.
Place the treadmill in a normal environment
with a relative humidity range of 30-75%. DO
NOT place close to steam room, sauna, indoor
pool or outdoor.
Rubber shock
absorption
Incline button
Pad adjuster
Secure lock

Related product manuals