EasyManua.ls Logo

JLL S400 - Electrical Power and Assembly Steps

JLL S400
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8
See content listing and diagram below for carton
contents. See Customer Service for contact
information if any parts are missing.
Electrical Power Requirements
220VAC 50Hz
Content listing
ITEM QUANTITY DESCRIPTION
1 1 Manual book
2 1 Powerd cord
3 1 Auxiliary cable
4 1 Installation tools
5 1 Fuse
6 2 Vertical frames
7 1 Safety key
8 2 Frame cover
9 1 Lubrication oil
10 1 Support crossbar
11 1 Console
12 1 Running deck
Installation tools
QUANTITY DESCRIPTION
2
Black arc washer
(M8)
2
Black at washer
(M8)
2
+ 2 spares
Silver split lock
washer (M8)
6
Silver at washer
(M8)
2
Split lock washer
(M10)
2 Flat washer (M10)
2
Tapping screw (ST 4
x 20)
12
Black Allen head bolts
(M8 x 15)
2
Black Allen head bolts
(M10 x 50)
1 Screwdriver
1 Allen key (M6)
At least two people must lift,
move or assemble it.
Use safe lifting methods.
Warning: Heavy equipment.
www.jlltness.co.uk www.jllelectronics.co.uk
1
3
5
4
6
7
9
11
12
1. Before starting the machine,
place your feet on the side
frames located on each side
of the running belt. NOTE: DO
NOT stand on running belt.
2. After the belt starts moving,
you can start walking on the
running belt and enjoy the run!
Warning: Falling hazard.
When starting unit.
8
2
10

Related product manuals