
Do you have a question about the Johnson Controls York ZH Series and is the answer not in the manual?
| Brand | Johnson Controls |
|---|---|
| Model | York ZH Series |
| Category | Air Conditioner |
| Language | English |
Understand and pay particular attention to signal words DANGER, WARNING, or CAUTION.
Warnings regarding improper installation, electrical shock, fire, and explosion hazards.
Inspect unit for possible damage during transit and note any damage on freight bill.
Lists installation limitations and codes to follow in U.S.A. and Canada.
Details CSA certifications for unit installation and usage.
Explains the model number breakdown for the ZH York units, covering various options.
Steps to take before installing the unit, like removing brackets and covers.
Lists installation limitations and codes to follow in U.S.A.
Diagram showing component locations on the Predator® unit.
Guidelines for selecting a suitable location for outdoor unit installation.
Details required clearances for proper operation and servicing.
Instructions for safely moving and handling the unit.
Diagrams illustrating 4-point and 6-point load weight distribution.
Table detailing unit weights, dimensions, and load locations.
Caution regarding proper weight distribution and fork length for lifting.
Lists weights for optional accessories like economizers and heaters.
Diagram showing physical dimensions for the ZH078-120 model.
Diagram showing physical dimensions for the ZH150 model.
Table detailing physical dimensions for various ZH078-150 models.
Shows gas pipe inlet and exhaust vent details for cabinet sizes.
Table specifying unit clearances in different directions.
Diagram showing bottom duct openings for the ZH078-150 unit.
Diagram showing electrical entry points.
Diagram showing side duct openings for the ZH078-120 unit.
Diagram showing side duct openings for the ZH150 unit.
Table detailing side duct dimensions for various models.
Diagram showing left/end duct opening for ZH078-150.
Table specifying left/end duct dimensions.
Diagrams showing roof curb and transition roof curb dimensions.
Guidelines for ductwork design and sizing according to ACCA or SMACNA methods.
Instructions for handling duct covers and reusing side panels for economizers.
Details on condensate drain reversibility and connection.
Information about the scroll compressor, R-410A refrigerant, and POE oil safety.
Information on filter types, installation, and importance of cleanliness.
Conformance requirements for field wiring, fuses, and disconnects.
Caution regarding transformer tap settings for different voltages.
Use water-proof connectors for electrical wiring to prevent moisture ingress.
Diagram showing field wiring for disconnect.
Guidelines for thermostat location and wiring.
Table specifying control wire sizes and maximum lengths.
Diagram showing typical electronic thermostat field wiring.
Caution regarding transformer tap settings for different voltages.
Provides detailed electrical data for the ZH078-150 units.
Electrical data tables for standard motors without powered convenience outlet.
Electrical data tables for Hi Static motors without powered convenience outlet.
Continues electrical data tables for Hi Static motors without powered convenience outlet.
Electrical data tables for standard motors with powered convenience outlet.
Continues electrical data tables for standard motors with powered convenience outlet.
Electrical data tables for Hi Static motors with powered convenience outlet.
Continues electrical data tables for Hi Static motors with powered convenience outlet.
Table of AHRI cooling and heating performance metrics.
Table covering unit dimensions and compressor specifications.
Table detailing condenser and evaporator coil specifications.
Tables for condenser fan and belt drive evaporator fan specifications.
Table detailing filter quantities and sizes.
Table specifying minimum supply air requirements for electric heat kW.
Guidelines for proper gas piping sizing and installation.
Table for sizing gas pipe based on capacity.
Table showing minimum supply air for gas heat.
Information on routing gas supply lines and recommendations.
Safety warnings regarding gas leak testing, pressure testing, and LP gas.
Information on converting units for LP gas and related standards.
Information on venting slots and factory-installed exhaust piping.
Overview of available options and accessories.
Information and limitations regarding duct smoke detectors.
Information on motorized outdoor dampers as factory or field options.
Information on factory or field installed economizer and power exhaust options.
Information on VAV option using VFD for constant supply-duct static pressure.
Details on the 0-5" WC pressure transducer used for static pressure sensing.
Information on factory-installed VFDs, mounting, and manual bypass switch.
Caution regarding VAV units with manual bypass in LINE position.
Safety warnings for VFD service and wiring diagrams for VFD installation.
Information on VFD terminal blocks for BAS wiring.
Functions driving the economizer, including minimum position.
Explains four types of free cooling options and their conditions.
How the system operates during free cooling, including thermostat and sensor inputs.
Details on setpoints, inputs, and outputs for power exhaust operation.
Image of the SE-ECO1001-0 Economizer Controller.
Details of the Smart Equipment™™ Economizer Board connections.
Descriptions of analog and binary output pins on the economizer board.
Detailed description of analog input terminals and their functions.
Details of binary input terminals and their functions.
Information on Indoor Air Quality sensor connection and operation.
How to check blower rotation and misphasing.
Table showing supply air limitations for various unit sizes.
Instructions for adjusting belt tension using a belt tension checker.
Information to assist in applying product at altitudes exceeding 1000 feet.
Table of correction factors for altitude and temperature.
Example calculations for corrected static pressure, BHP, and sea level conditions.
Step-by-step guide for selecting the correct blower drive.
Table for selecting RPM based on unit size, HP, and sheave settings.
Airflow performance data for side duct applications.
Airflow performance data for side duct applications.
Airflow performance data for ZH120 (10 Ton) side duct application.
Airflow performance data for ZH150 (12.5 Ton) side duct application.
Airflow performance data for bottom duct applications.
Airflow performance data for bottom duct applications.
Airflow performance data for ZH120 (10 Ton) bottom duct application.
Airflow performance data for ZH150 (12.5 Ton) bottom duct application.
Table for selecting RPM based on unit size, HP, and sheave settings.
Details on indoor blower motor, sheave, and belt specifications.
Specifications for the power exhaust motor.
Procedures for balancing air distribution in the unit and duct systems.
Method One for checking air quantity using pressure readings.
Method Two for checking air quantity using drilled holes and a manometer.
Graph showing dry coil delta P related to airflow.
Caution regarding blower speed changes and their impact on static pressure and BHP.
Example calculation for determining required datum diameter for motor sheave.
Table for motor sheave datum diameters.
Table providing additional static resistance values.
Step-by-step sequence for cooling operations.
Operation of the indoor blower in continuous and intermittent modes.
Startup and control procedures for optional VAV units.
Operation with a single enthalpy sensor for economizer control.
Operation using dual enthalpy sensors for economizer control.
Operation with economizer and power exhaust.
Operation of motorized outdoor air dampers.
Monitoring and handling of cooling operation errors.
Function and behavior of pressure and evaporator limit switches.
How the unit operates in low ambient cooling conditions.
Compressor protection features including ASCD and minimum run time.
Sequence of operation for the electric heat section.
Errors related to electric heat operation.
Safety controls monitored by the UCB for electric heat.
Tables for electric heat limit settings in different cabinet sizes.
Sequence of operations for gas heating.
Function of the ignition control board in gas heating.
Importance of correct anticipator setpoints for heat cycles.
Errors related to gas heating operation, including lock-out conditions.
How the UCB and ICB monitor the gas valve.
Safety controls monitored by the UCB for gas heat units.
Table for gas heat limit control settings.
Table for gas heat anticipator setpoints.
Procedures for starting the unit in cooling mode.
Procedures for starting the unit in gas heat mode.
Steps for lighting the main burners.
Checks to perform after the heating section is operating.
Procedure for checking gas heat input for first and second stages.
Table for calculating gas rate based on time for one revolution.
Procedure for adjusting manifold gas pressure for heat stages.
How to determine and adjust temperature rise.
Steps for inspecting and servicing burners and orifices.
Instructions for charging the unit with Thermal Expansion Devices.
Components needed to access control points on the Smart Equipment™™ control.
Image of the Unit Control Board.
Details of the Smart Equipment™™ Unit Control Board connections.
Details on UCB thermostat connection terminals and functions.
Details on UCB input connections for temperature and pressure sensors.
Details on UCB output connections for heating, fan, and compressor control.
Details on UCB connections for safety switches and indoor blower overload.
Details on UCB connections for SA Bus and FC Bus communication.
Table detailing preferred cable types for FC and SA buses.
Table listing ignition control flash codes and their meanings.
Start-up and service data instruction for commercial package units.
Checklist for performing equipment start-up.
Statement regarding the warranty policy and procedure.
Instructions on how to complete startup using LCD or MAP Gateway.
General safety warnings for inspections and start-up procedures.
Information regarding system design parameters.
Checklist items for the initial inspection of the unit.
Checklist items related to the blower and drive components.
Checklist items for exhaust and economizer inspection.
Procedures for taking air flow measurements.
Table for recording electrical data measurements.
Procedures for taking operating measurements during cooling.
Checks for refrigerant circuit safety switches.
Procedures for taking operating measurements during gas heating.
Verifying staging controls for heating and cooling.
Verifying VFD operation and motor speed modulation.
Final inspection steps before concluding the start-up.












Loading...