INSTALLATION, OPERATION & MAINTENANCE
VERSECON AIR CONDITIONING UNIT
Supersedes 145.05-NOM1 (1107)
Form 145.05-NOM1(708)
MODEL YSWD & YSWU

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Johnson Controls York VERSECON YSWD Series and is the answer not in the manual?

Johnson Controls York VERSECON YSWD Series Specifications

General IconGeneral
RefrigerantR-410A
Capacity1.5 to 5 tons
Voltage208/230V
Phase1
DimensionsVaries by model
WeightVaries by model

Summary

General Safety Guidelines

Safety Symbols

Explains hazard warning symbols used in the document.

Section 2 – Installation

Unit Inspection

Instructions for inspecting the unit upon receiving it for damage.

Location and Clearances

Guidelines for selecting a suitable location and required access clearances.

Rigging and Unit Handling

Procedures and safety precautions for moving and rigging the unit.

Section 3 – Start-Up

Pre-Startup Requirements

Checklist of tasks to perform before unit start-up.

Verifying Compressor Rotation

Procedure to ensure compressors operate in the correct direction.

Initial Start-Up

Steps to follow for the first unit operation after installation.

Section 4 – Maintenance

Periodic Maintenance – Monthly

Tasks to perform monthly, including filter checks and oil levels.

Periodic Maintenance – Three to Six Months

Tasks to perform every three to six months.

Periodic Maintenance – Yearly

Tasks to perform annually, including unit inspection and sheave alignment.

Section 5 – Sequence of Operation

ON / OFF

Describes the methods to switch the unit ON or OFF.

Supply Fan Operation

Details on programming and operating the supply fan.

Mechanical Cooling Operation

Parameters and logic for controlling the cooling function.

Compressor Staging

Explanation of how compressors are staged based on demand.

Section 6 – User Interface Control Center

Keypad

Description of the function of each button on the keypad.

Input

Lists available analog and digital input points.

Setpoints

Procedure for changing setpoints via the keypad.

Setting Date and Time

Instructions for setting the unit's date and time.

Communications

Information on unit communication protocols and wiring.

Section 7 – Parameter Descriptions and Options

Table 20 – Definitions

Glossary of menu items and their definitions.

Section 8 – Service

Analog Inputs

Details on analog input types and their functions.

Faults and Alarms

Explains fault conditions and alarm management.

Control Board Configuration

How to configure main and auxiliary control boards.

Wiring Diagrams

Constant Volume, Variable Air Volume

Control wiring diagram for CV, VAV units.