4.1 Unpack and Inspect
All units have been carefully checked for their operational reliability before shipment.
 Immediately after receipt, please check the outer packaging for damages or any signs of improper handling.
 Report any possible damages to the forwarder and your responsible sales representative. In such a case,
state a description of the defect, the type and the serial number of the device. IMPORTANT NOTE: Report
any in-transit damage immediately. Damage reported later shall not be recognized.
 Carefully unpack the unit to prevent any damage.
 Check the completeness of the delivery based on the packing slip and/or purchase order.
 The X0365 LTR-150 comes with the following components.
Item Description Quantity
1 LTR-150 1
2 6 ft. (2 meter) Mains Power Cord (US / EU 100 -240 VAC 50/60Hz) 2
3 Dry Block Insert (for up to 48 thermocouples, 3 IRTD, & 1 Reference Probes 1
4 Thermocouple Fixture 1
5 Insert Transport Cover 1
6 Insert Exchange Tool 1
7 Extruded Sleeves for thermocouples (16) 16
8 External Reference Control Probe 1
9 USB to Serial Communications cable (connection to Kaye hardware) 1
10 Calibration Certificate 1
11 User Manual 1
Save the packaging!
The LTR-150 is delivered in special protective packaging.
Save the packaging for returning the instrument safely to the manufacturer for recalibration or repair.
Use the type plate to check if the delivered unit corresponds to your order request.
4.2 Placement
Ensure that the LTR-150 storage and operation conditions described below are met:
Only suitable for indoor use, do not use outdoors.
Operate only in the vertical position on an even surface. The surface must be stable, clean, and dry.
IMPORTANT NOTE: If the operation positions do not conform to what is described then the structural safety
andthespeciedpropertiesoftheLTR-150isnotguaranteed.
Sufcientclearancearoundthemachine;greaterthan3feet(1meter)inthefrontand1.5feet(0.5meters)onthe
sidesandback.Sufcientheadclearanceandfreespaceabovethemachine.
Sufcientventilationmustbeensured.
Donotoperatenearammablematerials.
The ventilation openings must not be blocked or covered.
The machine must be installed in a manner so that it can be easily switched off at any time.
Not suitable for applications with high vibration or possible contamination
Chapter 4. Getting Started