14
| Kaye LTR-150 - Dry Block & Liquid Bath All-in-One Temperature Calibrator
4.3 Connect to Main Power
Ensure the following before powering up the LTR-150:
• Ensure supply voltage is from 100- 240 VAC 50/60 Hz.
• Connect the LTR-150 only to a properly installed and grounded, three-pronged outlet.
• Do not use any extension cables or adapter plugs.
• Use only the original power cables supplied by Kaye or approved, like power cable.
IMPORTANT! “KILL” switch!
The plug of the mains connecting cable serves as a “KILL” switch.
• Ensure that the plug is always easily accessible and easy to reach.
• In an emergency, pull the plug, so that the machine is isolated from the mains.
4.4 LTR-150 Startup
PriortopoweringuptheLTR-150performthefollowingtasks;
• Unscrew the Insert Transport Cover exposing the Dry Block Insert.
• Connect the External Reference Probe to the connector marked “ext Ref” on the front panel
and insert into the dry block using one of the 2 holes sized specifically for the Reference Control
Probe.
Power On the LTR-150 by utilizing the Power Switch on the front panel
Once powered on, the Kaye LTR-150 splash screen will appear for approximately thirty seconds followed
briefly by the model and firmware version before presenting the Remote Control home screen.
Chapter 4. Getting Started