44 / 180
Installation
2017/11
3.6 Installing the control unit
• Select the mounting position making sure that:
– there is a safety socket in the direct vicinity of the control units.
– The connecting cable from the wastewater pump and oat
switch can be installed correctly and routed to the control unit.
– The control unit can be fastened safely and sufciently.
• Unscrew the housing cover <5>
• Break out the cable ducts <1> with a suitable tool
• If an external potential-free contact (external alarm signal)
connection is provided for this installation, break out the cable duct
<1B>
• Press the rubber grommets <2> into the openings <1>
• Fit all three fastening screws (drilling template included in the
scope of delivery). Make sure that the gap <4> between the screw
heads and fastening area is approx. 3 to 4 mm
• Suspend the control unit on the three fastening screws and press
down lightly
1
1
1B
5
2
Ill. [10]
32
4
Ill. [11]