EasyManua.ls Logo

Keyscan CA8WL-AL - Page 27

Default Icon
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Keyscan Inc. A Member of the Kaba Group CA8WL-AL Rev. B Installation Guide (07.15)
27
Within 5 seconds of establishing the connection, the CA8WL-AL should receive power from the PoE
source and begin booting up. The system status LED illuminates in amber and the on-board piezo
emits a beep.
Using a voltmeter, check the following terminals on the CA8WL-AL for +12V DC:
POWER OUT + (TB6)
DC Power Supply +12V DC
Ensure the right cover on the CA8WL-AL control board has been removed.
Connect the +12V DC power supply to the POWER IN terminals (TB6) on the CA8WL-AL.
Upon applying power, the CA8WL-AL begins booting-up. The system status LED illuminates in amber
and the on-board piezo emits a beep.
Using a voltmeter, check the following terminals on the CA8WL-AL for +12V DC:
POWER OUT + (TB6)

Table of Contents