EasyManua.ls Logo

Keysight E3632A - Operating Checklist

Keysight E3632A
73 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2Service
60 Keysight E3632A Service Guide
Operating Checklist
Before returning your power supply to Keysight for service or repair check the
following items:
Is the power supply inoperative?
Verify that the AC power cord is connected to the power supply.
Verify that the front-panel power switch is depressed.
Verify that the power-line fuse is installed:
Use the 4 AT, 250 V fuse for 100 Vac or 115 Vac operation.
Use the 2.5 AT, 250 V fuse for 230 Vac operation.
Verify the power-line voltage setting.
Refer to the E3632A User’s Guide.
Does the power supply fail self-test?
Verify that the correct power-line voltage is selected.
Refer to the E3632A User’s Guide.
Remove all load connections to the power supply.
Ensure that all terminal connections are removed while the self-test is
performed

Table of Contents

Other manuals for Keysight E3632A

Related product manuals