A-61075 March 1997
EB-5
Operations checklist
Setup:
√ Turn on power switch.
√ Calibrate the machine.
√ Adjust the feed/separator rollers.
√ Adjust the feed shelf.
√ Adjust the feeder side guides.
√ Adjust the exit hopper side guides.
√ Adjust the exit hopper end stop.
√ Install the proper exit hopper deflector.
√ Prepare documents to feed into transport.
Running a Job:
√ Enable the machine from the host system.
√ Select an application mode.
√ Input any temporary/override operating values.
√ Enter or verify the starting Image Address.
√ Enter or verify the starting document image level.
√ Press the Run key.
√ Feed documents.
√ Press the Stop key.
√ Execute Scanner End-of-Job.
√ Remove documents from the exit hopper.
√ Turn off power switch.