1.Before starting operation
Check the power switch
Make sure that the power switch on the operation panel is turned off.
Connection of Power Cable
Make sure that the power switch of operation panel is off.
Insert the attached power cable into the outlet of power box
(Located at the lower left on the front side) fully to the end.
Check the indicated voltage carefully.
Connection to the air supply
Connect the hose from the compressor to the attached coupler. Connect the coupler to the port of power box.
Supply air at least at 0.6 MPa.