KONE Maintenance Method
MX10 / MX20 MCP Procedures - ASME A17.1-2013 / CSA B44-13
© 2014 KONE Corporation PSK8-604-MX10/MX20
All rights reserved.
102 (-) 2014-12-15
12) Back out of menu.
13) Return elevator to normal operation by putting switch 270 UP.
14) Register call to bottom terminal floor.
Car will start.
15) After 77:U turns off, press and hold buffer test button.
Elevator will run onto buffer. Overrides NTS.
16) Run elevator off buffer using following procedure:
Reconnect the XME and XCT connectors on the ETSL board 1.
Cycle controller power to reset ETSL faults, if any.
Put elevator on machine room inspect by setting switch 270 DOWN.
Temporarily jumper final limits, LCEADON2 XH1/1-5.
Run elevator up above final limit.
Remove temporary jumper from LCEADON2 XH1/1-5.
Cycle controller power to clear any outstanding faults.
17) Remove all test weights.
18) Return elevator to contract speed:
Put elevator on machine room inspection by setting switch 270 DOWN.
Access menu 6-2 and set to contract speed:
- 350 FPM: 1.78 m/s
- 500 FPM: 2.54 m/s
- 700 FPM: 3.5 m/s
Access menu 6-99 and select 1 to save.
Remove tie down from counterweight safety.
Verify buffer returns to full extension within 90 seconds
19) Run and test elevator.
20) Enable doors and hall calls.