52
Step 3
Readjust the position of the base braces
so that the 2 m vertical frame can be
mounted. Secure the connections with
gravity pins. Firmly tighten the nuts at the
base braces. Using a spirit level, check the
scaffold for proper vertical and horizontal
alignment of both its short and long sides.
If necessary, adjust it by means of the
height-adjustable castors.