62
4.6 Ballast load
Free-standing scaffolds must be loaded with ballasts at the traverses to ensure stabil-
ity. The number of ballasts required depends on the height of the scaffold. For details,
please refer to the tables below (pages 29 and 31).
Ballast loading of stabilisers
indoor installation outdoor installation
eld lenght L = 2.00 m
A B
C
D
Standing
height in m
Position Position
A B C D A B C D
0.9 0 0 0 0 0 0 0 0
2.3 8 8 8 8 8 8 8 8
Scaffold without stabilisers, without outriggers
The ballast weights will be xed with the ballast holders (accessories) art.-no. 704191
at the vertical frames.