EasyManua.ls Logo

Kubler Sendix 58 Series - Installation; Electrical Installation; General Connection Information; Terminal Assignment 58 xx

Kubler Sendix 58 Series
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Kübler Group 4 Installation
HB Profibus Interface - R67068.0002 - 01 EN - 11
4 Installation
4.1 Electrical Installation
4.1.1 General Information for the Connection
ATTENTION
Destruction of the device
Before connecting or disconnecting the signal cable, always discon-
nect the power supply and secure it against switching on again.
NOTICE
Current limitation
Use a suitable external fuse for encoder protection, for a maximum
current of 500 mA.
NOTICE
General safety instructions
Make sure that the whole plant remains switched off during the elec-
trical installation.
Make sure that the operating voltage is switched on or off simultan-
eously for the device and the downstream device.
Use a PELV supply voltage source according to EN60204-1 with
the proper operating voltage and the maximum permissible output
current.
4.1.2 Terminal Assignment 58xx
PROFIBUS connection M12 connector