Putting into service
Mower conditioner
FC302RG - FC352RG
27
KN271BGB C
$Putting into service
1. Description of control elements
The machine is supplied with an 18 mm box wrench (1)
to carry out certain adjustment and maintenance tasks.
2. Coupling and uncoupling
Description of coupling elements
- A PTO shaft 1 3/8’’ - 6 splines.
- A hose that controls the mowing unit raising/lowering.
- Two hydraulic hoses controlling the drawbar shift
cylinder.
- A 7-pin electric plug for the electrical signalling
equipment.