5
3. Connect tubing to water source then ush water lines to
check for leaks.
4. Route appropriate tubing from the remote carbonator locaton
to the carbonated water inlet at the unit and connect tubing
to inlet.
5. Route appropriate tubing from the syrup pump location to the
syrup inlets and connect tubing to all syrup inlets.
6. Route appropriate tubing from the CO
2
source location to the
CO
2
inlet at the remote carbonator location.
7. Install remote carbonator per manufacturer’s instructions.
8. Route the power supply cord to a grounded electrical outlet
of the proper voltage and amperage rating.
9. Route drain hose from designated open type drain to tting
on Drip Tray and connect hose to tting.
10. Reattach Drip Tray/Cup Rest to unit.
DO NOT PLUG UNIT INTO GROUNDED ELECTRICAL
OUTLET AT THIS TIME. Makesurethatallwaterlines
aretightandunitisdrybeforemakinganyelectrical
connections
! WARNING
Drain line must be insulated with a closed cell
insulation. Insulation must cover the entire length of
thedrainhose,includingttings.Thedrainshouldbe
installed in such a manner that water does not collect
in sags or other low points, as condensation will form.
! CAUTION
Pouring hot water down the drain may cause the Drain
Tubetocollapse.Allowonlylukewarmorcoldwaterto
enter the Drain Tube. Pouringcoee,tea,orother
similar substances down the drain may cause the Drain
Tube to become clogged.
! ATTENTION
A
A. Drain Fitting
B. Drain Line
C. Drip Tray
B
C
Installing Remote Syrup Pumps
1. Install BIB rack and remote pumps according to
manufacturers’ instructions.
A
B
C
A. Syrup Pump
B. CO
2
Line
C. Fitting
D. Oetiker Pliers
D
3. Using tubing cutters, cut any pump CO
2
supply line and
install tee tting, then route appropriate tubing from the CO
2
supply to the tee tting at syrup pumps.
4. Connect tubing from dispenser syrup inlet to the syrup pump
outlet tting. Repeat for each syrup line/pump.
A
B
C
A. Syrup Pump Outlet
B. Syrup Pump
C. Fitting
Use proper connector for syrup manufacturer
! ATTENTION
A. Syrup Pump Inlet
B. Fitting
C. BIB Connector
D. Oetiker Pliers
A
B
C
D
5. Install BIB (bag in box) connectors onto the syrup pump inlet
tubing.
6. Connect syrup BIBs to connectors. Repeat for each syrup
line/pump.
2. Once pumps and BIB rack are installed, measure and cut
tubing to length between the pump CO
2
inlets, then connect
tubing to all pumps.