EasyManuals Logo
Home>Lantronix>Print Server>MPS100

Lantronix MPS100 Installation Guide

Lantronix MPS100
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #7 background imageLoading...
Page #7 background image
Installation
2 - 1
2 - Installation
2.1 Product Description
The front panel of the MPS has a Test button, LEDs, a power connector, and one of the
following Ethernet ports: a BNC connector for 10BASE-2 (MPS1-2), an RJ45 port for
10BASE-T (MPS1-T), or an RJ45 port for 10/100BASE-T (MPS100). The rear panel has a
Centronics connector.
The
LINK
LED is solid green when there is a valid Ethernet network connection. The
ACT
(Activity) LED ßashes green or red when the server is in use. The
100
(100 MBit)
LED (MPS100 only) is solid green when a 100BASE-T network is connected.
MPS100
TEST
LINK
5VDC
AC
T
100
Centronics Connector
10/100BASE-T Port
“front”
“back”

Other manuals for Lantronix MPS100

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lantronix MPS100 and is the answer not in the manual?

Lantronix MPS100 Specifications

General IconGeneral
BrandLantronix
ModelMPS100
CategoryPrint Server
LanguageEnglish

Related product manuals