Do you have a question about the Lennox CBA25UHE Series and is the answer not in the manual?
Model | CBA25UHE Series |
---|---|
Type | Air Handler |
Refrigerant | R-410A |
Blower Motor | Variable Speed |
Dimensions | Varies by model |
Weight | Varies by model |
Motor Type | ECM |
Heating Options | Electric heat |
Voltage | 208/230V |
General overview of the air handler unit and its features.
Critical safety alerts for installation, service, and operation.
Detailed dimensions, diagrams, and piping plate information for upflow configuration.
Detailed dimensions, diagrams, and piping plate information for horizontal configuration.
Technical specifications, electrical requirements, and installation clearances.
List of available accessories for the unit.
Explanation of model number coding for CBA25UHE series.
Information on blower speed taps and operation.
Performance data for CBA25UHE-024, -030, and -036 models.
Performance data for CBA25UHE-042 model.
Description of main parts like control box, coil, and drain pans.
Recommendations for unit matching and system setup.
Data for 4-10 kW electric heat kits for CBA25UHE-024.
Data for 4-15 kW electric heat kits for CBA25UHE-030.
Data for 4-15 kW electric heat kits for CBA25UHE-036.
Data for 4-15 kW electric heat kits for CBA25UHE-042.
Catalog numbers for replacement circuit breakers.
Step-by-step guide for heat section installation.
Procedure for rotating circuit breakers for proper mounting.
Instructions for installing circuit breaker covers.
Guide for making electrical power connections.
Specific setup and modifications for upflow installations.
How to adjust blower speed for electric heat operation.
Instructions and considerations for horizontal installations.
Steps for configuring left-hand air discharge.
Specific setup and considerations for downflow installations.
Safety precautions for brazing operations with HFC-410A refrigerant.
Table detailing liquid and vapor line sizes for different models.
Warnings related to brazing operations and pressurization.
Step-by-step guide for making brazed connections with nitrogen purge.
Instructions for installing drain pans and lines, including traps.
Recommendations for duct connections and insulation.
Steps for connecting refrigerant lines to the coil.
Methods to ensure an airtight seal for the unit cabinet.
Steps for connecting field supply wires to the unit.
Procedure to convert voltage for 208V operation.
Guide for filter maintenance and replacement.
Detailed wiring diagrams for electric heat and air handler connections.
Coil cleaning and general upkeep recommendations.
Steps for verifying system operation after installation.
How the unit operates in cooling, heat pump, and electric heat modes.
Explanation of ECM motor functionality and external static pressure.
Steps for diagnosing 230VAC voltage issues for the motor.
Steps for diagnosing low-voltage communication issues.
Detailed checklist items for upflow installation verification.
Detailed checklist items for horizontal installation verification.