EasyManua.ls Logo

LGMG MT86 - Page 92

Default Icon
165 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MT86 Operation and Maintenance Manual
86
1. Re-tighten the thrust rod
bolts/front and rear leaf spring bolts
periodically at the interval specified
in "5.2 MT86 mining dump truck
compulsory maintenance details". If
the engine has operated for 30 hours
during the truck shipment process, the
user shall immediately perform the
first re-inspection of the thrust rod
bolts, and re-tighten bolts every 500
hours (5,000km) after 4-level
maintenance.
2. Push rod bolt re-tightening table
Application
Specification
Tightening
torque
*
(Nm)
Front push rod
bolt
M20
690Nm
Upper/ lower
thrust rod bolt
M27
1000Nm
Transverse thrust
rod bolt
(depending on
actual truck
configuration)
M24
900Nm
4.6.1 Front suspension system
The front suspension system mainly consists of
parallel semiellipse leaf spring, cylindrical

Related product manuals