Hinet UPS User Manual
Page 24 (06/01)
5.2.6 Return from Manual Bypass to normal Operation
This procedure describes how to start the UPS and how to transfer the load from the maintenance bypass to the UPS
inverter.
Hinet is restored back to operation after connecting the Maintenance (manual) by-pass switch in the following order:
1. switch on INPUT RESERVE switch ?;
2. switch on INPUT MAINS switch ?;
3. switch on BATTERY fuses switch ?;
4. switch on OUTPUT switch ?;
5. switch off MAINTENANCE BYPASS switch (manual);
6. switch on the inverter, pressing ENTER in the INVERTER ON-OFF display
The load is once again powered from Hinet. Place the mechanical lock, and eventually the pad-lock too, back onto the
MAINTENANCE BYPASS (manual) switch.
The UPS is operating in normal conditions and the inverter is supplying the load.
5.2.7 Emergency Power Off (EPO)
This circuit has been designed to switch off the UPS in emergency conditions (i.e., fire, flood, etc.).
To check that it operates correctly proceed as described below.
1. Press the EPO pushbutton: the UPS switches off within 3 seconds and stops powering the load [buzzer alarm and
ALARM LED activation ON].