Do you have a question about the Liebert NX 10kVA and is the answer not in the manual?
Capacity | 10 kVA |
---|---|
Topology | Double Conversion Online |
Output Voltage | 208/220/230/240 VAC |
Efficiency | Up to 94% |
Humidity | 0-95% non-condensing |
Input Frequency | 40-70 Hz |
Output Frequency | 50/60 Hz |
Battery Type | VRLA |
Form Factor | Tower |
Communication Ports | RS-232, USB |
Operating Temperature | 0°C to 40°C (32°F to 104°F) |
Precautions for handling and installing battery cabinets to prevent hazards.
Visual checks of equipment and shipping containers for damage or missing items.
Examination of UPS and battery equipment for transit damage and verification of model/serial numbers.
Verifying equipment identification tag to confirm type and size of the UPS.
Guidance on selecting an appropriate installation site considering environmental factors.
Details on the physical construction of the UPS, including panels, access, and cooling.
Guidelines for selecting and sizing power cables based on voltage, current, and installation conditions.
Explanation of split bypass (dual-input) configuration and wiring for the NX system.
Overview of control cables, monitor board features, and auxiliary connections.
Information on input and output dry contacts for alarm signaling and system status.
Procedure for starting the UPS system from a fully powered-down state.
Procedure to transfer the load from the UPS inverter to the Maintenance Bypass line.
Steps to safely power down the UPS system completely.
Recommendations for matching internal and external batteries for optimal backup.
Critical safety precautions when working with UPS batteries, emphasizing lethal voltages.
Information on battery charging and handling before and after shipment.
Impact of ambient temperature on battery performance, life, and capacity.
Details on undervoltage, end-of-discharge, and fuse-blow protection mechanisms.
Principles for fitting and connecting external battery cabinets, including overcurrent protection.
Guidance on selecting, handling, installing, and connecting battery cabinets.
Requirements for using non-standard batteries, including remote disconnects.
Description of the bypass switch function for load transfer.
Operation of the bypass cabinet when the UPS is supplying the load.
Operation of the bypass cabinet providing an alternate power path for maintenance.
Operation of the bypass cabinet for maintenance, where the UPS is not protected.
Guidelines for mounting the maintenance bypass cabinet next to or standalone from the UPS.
Steps for preparing and installing wiring for the maintenance bypass cabinet.
Procedure for physically connecting the UPS and bypass cabinets.
Steps for starting, shutting down, and transferring between UPS and bypass modes.
Functionality and requirements for the Dual Bus Synchronizer for parallel UPS systems.
Details on setting up and configuring parallel UPS systems for reliability and expansion.
Procedures specific to installing parallel UPS systems, including cabinet and cable connections.
Steps for checking and setting parameters for a parallel UPS system startup.
Procedure for starting up parallel UPS modules and verifying normal operation.
Information on battery circuit breaker boxes for isolation and overcurrent protection.
List of industry standards and certifications the UPS system complies with.
Operating conditions including temperature, humidity, and noise levels for the UPS.
Physical dimensions, weight, ventilation, and color specifications of the UPS.
Detailed electrical specifications including voltage, current, and battery data.
Specifications for lug sizes and torque values for electrical connections.
Data for calculating required cable lengths from floor to internal UPS connection points.