Summary flowchart of LogTag UTRIX assembly
MANUFACTURING PHASE 1: PCBA assembly and mounting in case
COMPUTER TEST (1.6)
TEST FIXTURE: UTRIX PCBA Test
Mark PCBA with QC failure
tag detailing reason for
failure and place in separate
marked container
Conformal coat over electronics (1.11)
Solder USB connector, Electro-cap & Bridge J1 (1.10)
Mount PCB in rear case (1.9)
SMD mounting (1.1)
Paste/SMD mounting/Reflow
INSPECTION
Solder quality (1.1)
Mark PCBAs that fail for
rework and place panel in
marked container with this
inspection reference.
Undertake correction action
to correct soldering problem.
Clean residue around sensor circuit and crystal areas (1.4)
Separate PCBAs from Panel (1.5)
Program (ICP) & Test (1.2)
Mark PCBA with ICP failure
tag detailing reason for
failure and place in separate
marked container