Lucent Technologies Enhanced VR Series Batteries
2 - Table of Contents Issue 5 December 1998
Storage Time 5 - 1
6 Installation
Introduction 6 - 1
Installation Tools, Materials, and Test Equipment 6 - 1
Product Manual 6 - 1
Unpacking and Handling 6 - 2
Safe Handling 6 - 2
Specific Unpacking Instructions 6 - 2
Battery String Location 6 - 4
Environmental Requirements 6 - 4
Mixing Batteries in a String 6 - 5
Initial Charging 6 - 6
Placing a Battery String Into Service 6 - 8
Installation Records 6 - 8
Voltage Measurements 6 - 8
7 Operation
Lead-acid Battery Gassing Rate 7 - 1
Service Life 7 - 2
Charging 7 - 2
Battery String Float Voltage 7 - 3
Charging Voltage Ripple 7 - 4
Battery and Ambient Temperatures 7 - 4
Capacity 7 - 5
Temperature Correction for Capacity 7 - 5
Example 7 - 5
Discharge Capacity Test 7 - 7
Recharge After Discharge 7 - 8
Boost Charge 7 - 8
8 Maintenance
Maintenance Schedule 8 - 1
Maintenance Routines 8 - 2
Individual Battery Voltages 8 - 2
Measuring Battery Temperatures 8 - 3
String Current Measurement 8 - 3
Inspection and Cleaning 8 - 3
Retorquing Inter-battery Connections 8 - 3
Flame Arrestor Vent Feature 8 - 4
Battery Replacement 8 - 4