EasyManua.ls Logo

MacDon M200 - WINDROWER OPERATION; OPERATIONAL SAFETY; BREAK-IN PERIOD

MacDon M200
55 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Form 169018 Revision C
M150/M200 Self-Propelled Windrower Pre-Delivery Checklist
Perform these checks and adjustments prior to delivery to your customer. The completed checklist should be
retained either by the operator or the dealer.
CAUTION: Carefully follow the instructions given. Be alert for safety related messages which
bring your attention to hazards and unsafe practices.
Windrower Serial Number: _____________________ Engine Serial Number: _____________________
9
ITEM
PAGE
Check for shipping damage or missing parts. Be sure all shipping dunnage is removed. -
Check for loose hardware. Tighten to required torque. 4
Check tire air pressures and adjust as required. 40
Check final drive hub lubricant level. 40
Check engine coolant level and strength at reserve tank. 41
Check air cleaner and clamps. 42
Check hydraulic oil level and check for leaks along lines. 42
Check fuel separator for water & foreign material. Drain and clean as necessary. Add fuel. 43
Check gear box lubricant level. 43
Check tension of A/C compressor belt. 43
Check machine completely lubricated. 32
Check neutral interlock system. 44
Check horn operation. 49
Check engine oil pressure indicator light at Cab Display Module. 47
START ENGINE AND RUN TO OPERATING TEMPERATURE 45
Check Cab Display Module for operation. 47
Check operator’s presence system. 47
Check alternator charge rate at instrument console. 47
Check fuel gauge for operation. 47
Check air conditioning functioning properly.
50
Check heater functioning properly.
50
Check instrument console gauge lights and interior lights for operation. 50
Check maximum (no load) engine speed at Cab Display Module
(M150 – 2270-2330 rpm) (M200 – 2250-2300 rpm).
47
Check exterior lights for operation.
48
Check hazard and signal lights for operation.
48
Check beacons for operation (if installed).
49
Complete the Header Pre-Delivery Checklist.
-
Check that manuals are with the windrower.
50
Check plastic coverings from cab interior removed.
50
Date Checked: _________________________ Checked by: ________________________

Other manuals for MacDon M200

Related product manuals