EasyManua.ls Logo

M&C ECM Series - Reception and Storage Guidelines

M&C ECM Series
29 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12 ECM | 1.01.00 www.mc-techgroup.com
+5 °C
[41 °F]
Sample
OUT
Sample
IN
Condensate OUT
Cooling
block
Figure 3 Schematic diagram of the heat exchanger function
11 RECEPTION AND STORAGE
The ECM gas cooler is a complete pre-installed unit.
Carefully inspect the ECM and any special accessories included with it immediately on arrival by
removing them from the packing and checking for missing articles against the packing list! Check
the items for any damage in transit and, if required, inform the shipping insurance company
immediately of the damage found!
Note
The cooler must be stored in a weather protected frost-free area!
During transport and when in storage, the cooler must always be stood up
with the transport feet positioned underneath so that the oil in the closed
compressor circuit cannot run out of this compressor case.
If the cooler is transported on its back by mistake, it must stood in the
operating position for approx. 24 hours before it is switched on!

Table of Contents

Related product manuals