EasyManua.ls Logo

Manitowoc MLC100-1 - Page 152

Manitowoc MLC100-1
218 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SETUP AND INSTALLATION MLC90A-1/MLC100-1 OPERATOR MANUAL
4-42
Published 12-10-19, Control # 258-05
2. Connect the chain (16, View E) to the actuator cable (15)
from the limit switch (14) at the jib point.
3. Connect the chain from the weight (17, View E) to the
chain (16).
4. Make sure the locking flag is stored in the limit switch as
shown in View E, Figure 4-26 on page 4-42
.
Item Description
1 Limit Switch (block-up limit)
2 Locking Flag
3 Actuator Cable
4 Block-Up Limit Chain
Figure 4-26

Table of Contents

Other manuals for Manitowoc MLC100-1

Related product manuals