EasyManuals Logo

Manitowoc National Crane NBT30H-2 User Manual

Manitowoc National Crane NBT30H-2
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #68 background imageLoading...
Page #68 background image
CONTROLS AND OPERATING PROCEDURES NBT30H-2 OPERATOR MANUAL
3-12
Published 03-18-2019 Control # 582-04
1. Position the crane in the work area and set the
outriggers. See Outrigger Setup, page 4-1 for
instructions.
2. Program the RCL. Use the load chart to estimate the
values.
3. Position the boom nose over the load. Do not try and
drag the load with the boom or hoist.
4. Perform the lift. Meter the controls when moving the load
to avoid sudden stops.
5. Retract and lower the boom after the lift is complete.

Table of Contents

Other manuals for Manitowoc National Crane NBT30H-2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc National Crane NBT30H-2 and is the answer not in the manual?

Manitowoc National Crane NBT30H-2 Specifications

General IconGeneral
BrandManitowoc
ModelNational Crane NBT30H-2
CategoryConstruction Equipment
LanguageEnglish

Related product manuals