CONTROLS AND OPERATING PROCEDURES NBT30H-2 OPERATOR MANUAL
3-12
Published 03-18-2019 Control # 582-04
1. Position the crane in the work area and set the
outriggers. See Outrigger Setup, page 4-1 for
instructions.
2. Program the RCL. Use the load chart to estimate the
values.
3. Position the boom nose over the load. Do not try and
drag the load with the boom or hoist.
4. Perform the lift. Meter the controls when moving the load
to avoid sudden stops.
5. Retract and lower the boom after the lift is complete.