STEP 7 - INSTALL CONTROL SWITCH - Continued
CONTROL SWITCH WIRING CONNECTIONS
(GRAVITY DOWN)
FIG. 42-1
CONTROL
SWITCH
JUNCTION
BLOCK
TERMINAL 1
GREEN
WIRE
WHITE
WIRE
BLACK
WIRE
STARTER
SOLENOID
FUSE
HOLDER
ASSEMBLY
NOTE: Electrical lines must be run into pump box through sealing grommets
(FIGS. 42-1 & 42-2). To ensure a good seal on the electrical lines, never
cut the sealing grommets.
5. Insert switch wiring through grom-
met on pump mounting plate (FIGS.
42-1 & 42-2). Connect the switch
wiring to the pump assembly as
shown in (FIGS. 42-1 & 42-2).
GROMMET
WIRING
HARNESS
CONTROL SWITCH WIRING CONNECTIONS
(POWER DOWN)
FIG. 42-2
POWER DOWN
MODULE
CONTROL
SWITCH
WIRING
HARNESS
GROMMET
FUSE
HOLDER
ASSEMBLY
STARTER
SOLENOID
GREEN
WIRE
BLACK
WIRE
WHITE
WIRE